Sunday Stash Report

Sunday, September 20, 2015
New numbers this week--a fabric order arrived and I bought one yard while shopping.

Stash in this week--10 yards
Stash in YTD--238.25 yards
Stash out this week--0.0 yards
Stash out YTD--166.0 yards


Stash is ahead 72.25 yards! 

Please see everyone's stash report at Patchwork Times. 

~LORI~ 

Rainbow Scrappy Saturday Orange

Saturday, September 19, 2015
Did I tell you I liked orange?  Yes, love it--four more orange blocks--


Please see everyone's orange posts at SoScrappy!

I've been checking my blocks totals.

60 Rainbow Scrappy Album Blocks--enough for two quilts
17 Red/White/Blue Album blocks--need to make more
17 Rainbow Scrappy Monkey Wrench/9 Patch blocks--need 20
14 Red/White/Blue Monkey Wrench/9 Patch blocks--need 20

More work to be done with Red/White/Blue blocks.  I may split my Album blocks up and make an album quilt featuring green, I'm not sure yet.  I'm not tired of making album blocks, but I am tired of some of the fabrics in my 2.5" squares box.  I'm sewing them into strips of 4 to be made into 16 patch blocks for a couple of projects I've been thinking about.  Wonderful mindless sewing--I love it! 

Friday was rainy and chilly.  I stayed in the camper and made French dip sandwiches in the crock pot using Laura Beth's recipe.  YUM!!  Thank you Laura Beth!!


My sandwich was half eaten before I remembered to take a pic.  A bowl is the best way to eat it, the bread can sop up all the delicious juices.  

Orange Creamsickle fudge has been on my mind.  Lorri2Rs makes it and its delicious.  My first efforts were grainy/sugary so I recooked it using more cream and patience.  The "cream" part was gone so I decided to add a chocolate ganache swirled in the orange.  


Hmmm, tasted pretty good, its in the car cooling.  I'll share it with Cecely tomorrow at the Visitor Center.  

Fabric came in the mail this week.  A planned start, the pattern has been on my bucket list for a while.  "Sunny Squares" was in McCalls Quilting July/August 2015.  



Although this quilt is made using batiks, I am using my 2.5" squares.  But the orange/golds were so pretty I ordered some solids to use.  Their placement of fabrics is NOT random, the same 16 fabrics are in the same position in all the blocks. Can you see them?   Mine will not be!  I have a couple of projects that will use 16 patch groups and I can hardly wait to start!

Tomorrow there will be no electricity ANYWHERE on Gavins Point Project (well, except in the powerhouse itself).  A switchover with a transformer (being replaced after 58 years) requires everything be disconnected.  The dam is still producing power and everyone else in the area has power--its just our small portion that will be off.  A generator will be brought in to power us while work is being done, but the initial work is done "in the dark".  I have all my extra batteries charged, its only going to be six hours (6am-noon).  I can still make fresh coffee (propane stove) but I better make sure all my laundry is dry and my hair washed/straightened tonight.  There will still be water (and I can use propane water heater) and my fridge can run on propane so it will be inconvenient but that's it.  The visitor center will be dark too, we can organize/sort/answer the phone etc.  The building has huge overhead windows so although it won't be bright light it won't be dark. 

I'm planning to sew on Sunday, so we better have electricity by then!  
 
~LORI~

Design Wall Wednesday and Weekly Goals

Wednesday, September 16, 2015
Two Monkey Wrench/9 Patch Red/White/Blue blocks this week--


I like to switch the light/dark areas of the Monkey Wrench portion. 

Weekly Goals

Four Orange Album Blocks
Two R/W/B album blocks
Two Monkey Wrench/9 Patch RWB blocks

Its been a busy week.  Mason turned 7.  A cake was baked and candles blown out--


 Maxwell is growing like a weed and a happy baby--



Asher loves his hat--


Grandpa is fair game when playing dogpile--




Technology is wonderful--instant pictures!!


And a family picture--



Its a beautiful day, warm and sunny.  Happy Anniversary to my Husband!  XOXOXO!

~LORI~


 

Rainbow Scrappy Saturday

Saturday, September 12, 2015
Orange is the Rainbow Scrappy Challenge color for September.  I LOVE orange!  I finished four Monkey Wrench/9 Patch blocks--


All have orange in them somewhere.  Please see everyone's orange projects at SoScrappy

Do you read lots of blogs?  I use "Feedly" but its not as handy as I'd like.  I particularly have problems leaving comments on Wordpress blogs.  The reading surpasses commenting by 10 to 1.  Many times I go back several posts (or more) on a blog.  How do you read blogs?  

~LORI~

Motivation Friday

Friday, September 11, 2015
Yes, some sewing is being done this week.  Six blocks should be done by Saturday.  But first I had to find my KEYS!!


How could I misplace such a large set of keys?  I do it regularly even though I have a dedicated hook to put them on.  

Visitor traffic has slowed at the Visitor Center.  Sometimes we have time for this--


Cecely and I are fans of microwave popcorn.  I bought a big box (44 bags) at Costco, about $.25 a bag.  Cecely likes to put M&M's in her bowl--sweet'n'salty.  

The weather is beautiful, warm days and cool nights.  I hate to see summer end.  

~LORI~

Labor Day and Weekly Goals

Monday, September 7, 2015
Labor Day, the first Monday in September, is a creation of the labor movement and is dedicated to the social and economic achievements of American workers. It constitutes a yearly national tribute to the contributions workers have made to the strength, prosperity, and well-being of our country.

Congratulations American Workers!

This week I made two R/W/B album blocks--


Well, they are mostly blue but that's Ok!  Maybe by next week I will have checked my totals for blocks, they have just been stacking up in their totes.  

Weekly Goals--

Two Orange Monkey Wrench/9 Patch blocks
Two R/W/B Monkey Wrench/9 Patch blocks

Another busy week.  Guild on Thursday and plan to babysit with the boys on Friday.  Whew!  How has your summer been?

~LORI~





 
 

 

Sunday Stash Report

Sunday, September 6, 2015
Time to update my stash report.  A few weeks ago I finished the flag wall hanging and Pat's wall hanging.  Total stash used was 3.5 yards.

Stash in this week--0.0 yards
Stash in YTD--228.25 yards
Stash out this week--3.5 yards
Stash out YTD--166.0 yards  


Stash is ahead 62.25 yards! 


Every little bit helps!  Please see everyone's stash report at Patchwork Times.

~LORI~